Most baler repairs are completed within 24 hours of the call (based on project complexity). For straightforward frame cracks or hinge breaks, we’re usually in and out the same visit. For larger structural failures or cracks that have spread across the machine, count on a longer fix and a heavier reinforcement.
If the breakdown is mid-day and the loading dock is backing up, ask about emergency response. After-hours service is available with a surcharge.